Structural steel, pipework and marine fabrication for main contractors across Ireland, built to drawing and delivered to programme.

Steel structure built out over water
01

Propeller wash screen support frames, Dublin Port

Fabrication and supply of propeller wash screen support frames for main contractor Wills Bros Ltd, as part of the Berths 52 & 53 project at Dublin Port. Each frame is a welded steel lattice structure, modelled in Tekla Structures and built to full assembly drawings issued for fabrication.

Wills Bros Ltd

Client

Dublin Port, Berths 52 & 53

Location

55 frame sets

Quantity

S355

Steel grade

~8.6 tonnes each

Frame weight

  • 508mm diameter, 16mm wall CHS frame piles, each around 10 metres long, with a continuous welded 30mm round bar guide rail
  • Welded box-section bracing and 400x200mm support members
  • Bolted M36 site connections and match-marked components for straightforward erection
  • Deliveries to Dublin Port commencing February 2026
Welded frame pile and guide pile assemblies in the fabrication workshop
02

District heating pipeline

Fabrication, jointing and installation of ductile pipe sections for a district heating network.

District heating network

Scope

Ductile pipe

Material

  • Pipe section jointing and installation
  • Welding and fitting to client specification
District heating pipeline sections laid and jointed in a trench

Credentials

Built to standard

CE-marked structural steel fabrication to EN 1090-1. All our welders are independently qualified to EN ISO 9606-1.